The original design and the drawings for it are also dealt with in It.For. desfated. The clock tower formed no part of the original design introduced for the building. Many changes have been preferred when the foundations were being constructed. The only connection with the clock tower with regard to which I had consultation with Messrs Webb & Bell, was the preliminary sketches, which, at the request of Sir M. Nathan, were submitted to Messrs Webb & Squires. These showed merely the architectural features and no detail.
It is a remarkable statement that he completes the contract letter & fixes the period for completion. The contract began on 7 January 1908 and was to be completed on or before 31 December 1909, or 24 months later. The period allowed was 24 months. The building was actually completed in May 1910. Mr. Fisher inquires why certain drawings which he preferred to be...
Paru. 16/(C).
original design,
the drawings for
are ales dealt with in It.For. desfated.
The clock tron formed no part of the
introduced
the building
many
Las been
prefered
o when the foundations
Cvene
rearing
comflation. The only
drawings only
connection
идать
39
with the clock tower with regard & which
I had
my
consultation with Miken wre
the parliminary sketches, which, at the
regunt y
Sir M. Nathan,
were submitted
Bell. These
Webt & Sugues
to Meat Aston Weff &
ضر
no tuction
showed
detail
merely
the architectural
features.
Pare. (71.
Jamanable t
statement that be completes the to
Follow
Mr.Fisher
building
one
wik
after
the Contact Lett
& fur
completion.
237
for
The contract began
7 January 108 to completion
or until the 122
lator.
ako
the Jeriod allowed
4.
& yours & Ima
June 1910. The building
or // month
completed in My 1981,
Mr. Jisha inquires why,
certin dhawing
chewings
B
which he prefund to be
No comments yet.